Atmospheric haze- specific instructions
Moderators: kgudger, bfinio, MadelineB, Moderators
-
nxg
- Posts: 14
- Joined: Fri Jan 19, 2007 2:28 pm
Need help ASAP
Hi Chris,
I do not understand this data that Gaby posted:
7. Home- 2
· Date= Jan. 17, 2007
· Time= 2:54 pm
· Temperature= 33° F
· Pressure= 30.72"
· Weather= clear
· Dark signal= 0.288v
· Sun signal= 3.74v
· Altitude angle= 26.47°
· Relative air mass= 2.244
· Ln signal= 1.239
· AOT= 0.041
It should be negative AOT, right ?
In any case, I am getting all AOTs negative, please help me understand this:
few examples:
Sun angle : 16.89,
Pressure (in inches): 30.33
Sun signal : 2.2v [ dark - sun ]
Airmass calculated : 3.44
MY ET : 1.78
AOT as -0.180.
=============
Sun angle : 29.85
Pressure (in inches): 30.30
Sun signal : 3.02v [ dark - sun ]
Airmass calculated : 2.01
MY ET : 1.78
AOT as -0.280
=============
Is it wrong ?
Thanks,
nxg
I do not understand this data that Gaby posted:
7. Home- 2
· Date= Jan. 17, 2007
· Time= 2:54 pm
· Temperature= 33° F
· Pressure= 30.72"
· Weather= clear
· Dark signal= 0.288v
· Sun signal= 3.74v
· Altitude angle= 26.47°
· Relative air mass= 2.244
· Ln signal= 1.239
· AOT= 0.041
It should be negative AOT, right ?
In any case, I am getting all AOTs negative, please help me understand this:
few examples:
Sun angle : 16.89,
Pressure (in inches): 30.33
Sun signal : 2.2v [ dark - sun ]
Airmass calculated : 3.44
MY ET : 1.78
AOT as -0.180.
=============
Sun angle : 29.85
Pressure (in inches): 30.30
Sun signal : 3.02v [ dark - sun ]
Airmass calculated : 2.01
MY ET : 1.78
AOT as -0.280
=============
Is it wrong ?
Thanks,
nxg
-
deleted-71447
- Former Expert
- Posts: 1019
- Joined: Fri Oct 28, 2005 11:43 am
- Occupation: Research Hydrologist
- Project Question: n/a
- Project Due Date: n/a
- Project Status: Not applicable
Hi nxg,
I also got different AOT values from Gabby's measurements.
For your first set of measurements, I calculated the same AOT as you. On the second set, I calculated an AOT of -0.38.
As far as an explanation for why your values are all negative, one possibility is that there is a problem with your ET value. For the first set of measurements, you would need an ET > 3.4 to bring your AOT into the positive range. I would suggest calibrating the instrument again, which is never a bad idea, even if your results seem reasonable. I do not think the m values are the culprit here - no matter how I change those, the AOT remains negative.
I hope that helps.
Chris
I also got different AOT values from Gabby's measurements.
For your first set of measurements, I calculated the same AOT as you. On the second set, I calculated an AOT of -0.38.
As far as an explanation for why your values are all negative, one possibility is that there is a problem with your ET value. For the first set of measurements, you would need an ET > 3.4 to bring your AOT into the positive range. I would suggest calibrating the instrument again, which is never a bad idea, even if your results seem reasonable. I do not think the m values are the culprit here - no matter how I change those, the AOT remains negative.
I hope that helps.
Chris
-
nxg
- Posts: 14
- Joined: Fri Jan 19, 2007 2:28 pm
I think I know
Hi Chris,
I think I know where the problem is. The graphical method of finding out ET gives me ln(ET), not ET, right ? If that is the case, then I am getting AOT as about 0.16 all the time. So, my ln(ET) was 1.78. Not ET.
I have to turn in the project in two days. I am assuming that anyways.
Thank you very much for your help. I really appreciate it.
I think I know where the problem is. The graphical method of finding out ET gives me ln(ET), not ET, right ? If that is the case, then I am getting AOT as about 0.16 all the time. So, my ln(ET) was 1.78. Not ET.
I have to turn in the project in two days. I am assuming that anyways.
Thank you very much for your help. I really appreciate it.
-
deleted-71447
- Former Expert
- Posts: 1019
- Joined: Fri Oct 28, 2005 11:43 am
- Occupation: Research Hydrologist
- Project Question: n/a
- Project Due Date: n/a
- Project Status: Not applicable
-
nxg
- Posts: 14
- Joined: Fri Jan 19, 2007 2:28 pm
Stupid question ?
Finally I am ready with the project [ tomorrow] presentation and stuck with the following question. If AOT is the measurement of Haze why is this supposed to be fixed ?
Thanks,
NxG
Thanks,
NxG
-
nxg
- Posts: 14
- Joined: Fri Jan 19, 2007 2:28 pm
My impression
Hi Chris,
While reading some part from haze101 -- I came across somewhere that AOT will be same, that's what confused me. Now, I did little more research and my confusion is clear.
Thanks,
NxG
While reading some part from haze101 -- I came across somewhere that AOT will be same, that's what confused me. Now, I did little more research and my confusion is clear.
Thanks,
NxG
-
nxg
- Posts: 14
- Joined: Fri Jan 19, 2007 2:28 pm
Thank you Chris
Hi Chris,
Thank you very much for your help. It went well, waiting for my grades.
Thanks,
NxG
Thank you very much for your help. It went well, waiting for my grades.
Thanks,
NxG
-
deleted-71447
- Former Expert
- Posts: 1019
- Joined: Fri Oct 28, 2005 11:43 am
- Occupation: Research Hydrologist
- Project Question: n/a
- Project Due Date: n/a
- Project Status: Not applicable
Nxg, I'm glad to hear it! I hope you will get the grades that you want.
Gabby,
I think that you did your calculations correctly. I believe that nxg and I were originally getting different results from you because there was some confusion about ln(ET) versus ET. Now that the confusion is cleared up, I rechecked one of your calculations and got the same result. Good for you for following up on the work!
Gabby,
I think that you did your calculations correctly. I believe that nxg and I were originally getting different results from you because there was some confusion about ln(ET) versus ET. Now that the confusion is cleared up, I rechecked one of your calculations and got the same result. Good for you for following up on the work!
-
deleted-71447
- Former Expert
- Posts: 1019
- Joined: Fri Oct 28, 2005 11:43 am
- Occupation: Research Hydrologist
- Project Question: n/a
- Project Due Date: n/a
- Project Status: Not applicable

